Upgrading mooSocial from trial to production

  • Buy full version
  • Go to the installed folder of a trial site and back up the 2 files: app\Config\plugins\plugins.xml and app\Config\settings.php
  • Download full version package and unzip it
  • Upload the unzip files and folder,  replace trial files and folders on your hosting.
  • Upload the two back up files: app\Config\plugins\plugins.xml and app\Config\settings.php to replace the existing two new files.
  • Clear global cache and test site again. All users, blogs, photos..will be intact
Last Updated On March 02, 2018